5 May 2020
Case Study VII: Dielectric measurement in a wind farm
By measurements, the actual operation conditions to which a series of transformers was subjected, has been verified.
This helped to demonstrate that the technical specification of the transformers were not appropriate to the real environment in which they should operate.
Read the case study ▶ Dielectric measurement in a wind farm
Discover more case studies:
Case Study VI: Tank Temperature Rise Verification
Case Study IV: Top lead exit thermal analysis
Case Study IV: Top lead exit thermal analysis
Case Study III: Forces under double inrush condition