5. Mai 2020

Case Study VII: Dielectric measurement in a wind farm

By measurements, the actual operation conditions to which a series of transformers was subjected, has been verified.

This helped to demonstrate that the technical specification of the transformers were not appropriate to the real
environment in which they should operate.

Read the case study Dielectric measurement in a wind farm



Discover more case studies:

Case Study VI: Tank Temperature Rise Verification

Case Study V: LV losses

Case Study IV: Top lead exit thermal analysis

Case Study IV: Top lead exit thermal analysis

Case Study III: Forces under double inrush condition

Case Study II – GSU Transformer Upgrade – Tank Hot Spot

Case Study I: Converter transformer load losses